人字骨架护坡塑料模具 人字骨架护坡钢模具
人字形骨架护坡模具 人字骨架护坡模具主要用于高速护坡砖模具、堤坝护坡转模具的生产,主要防止水土流失作用,人字形骨架护坡模具 人字骨架护坡模具主要采用工程聚丙烯原料或ABS原料注塑成型,骨架护坡模具采用99%原包料生产,可以周转200次以上,具有密度高、光亮度高、韧性强、不易变形 损率低等优点。人字形骨架护坡模具 人字骨架护坡模具工时应注意以下几点:
1.施工前应清理坡面,坑凹,使坡面大致平整。
2.浇注人字形护坡骨架前,按设计要求放样,挖沟,骨架嵌入坡面,必须保证模具埋深。
3.骨架与坡面密贴,骨架流水面应平滑。
4.路堑边坡存在地下水露头的,引入排水系统,不可堵塞。
5.骨架挡水缘施工过程中必须与骨架基础一并浇注,并衔接好,不得形成急流后冲刷自然边坡,以保证边坡稳定。
6.边坡平台截水沟内的水按施工工点图上标注的里程合理的汇排入排水沟。
Herringbone skeleton slope protection mold herringbone skeleton slope protection mold is mainly used in the production of high-speed slope protection brick mold and dam slope protection transfer mold, mainly to prevent soil erosion, herringbone skeleton slope protection mold The herringbone skeleton slope protection mould mainly adopts engineering polypropylene raw material or ABS raw material for injection molding. The skeleton slope protection mould adopts 99% raw material for production, which can be turned over for more than 200 times. It has the advantages of high density, high brightness, strong toughness, not easy to deform and low loss rate. The following points should be paid attention to during the working time of herringbone skeleton slope protection mould:
1. Before construction, the slope surface shall be cleaned and filled with pits to make the slope surface roughly flat.
2. Before pouring herringbone slope protection framework, setting out and trenching shall be carried out according to the design requirements, and the framework shall be embedded in the slope surface, and the mold burial depth must be ensured.
3. The skeleton shall be closely attached to the slope surface, and the water surface of the skeleton shall be smooth.
4. If there is groundwater outcrop in the cutting slope, it shall be introduced into the drainage system and shall not be blocked.
5. During the construction of skeleton water retaining edge, it must be poured together with skeleton foundation and connected well. It is not allowed to wash the natural slope after the rapid flow to ensure the stability of the slope.
6. The water in the intercepting ditch of the slope platform shall be reasonably collected into the drainage ditch according to the mileage indicated on the construction site drawing.